Project description
The project request included engineering and manufacturing of a steel handling facility. It was a combined master- and sub-bundle handling plus a bar bending machine.
WeSolve AB/PROAC AB attended several project meetings at the costumer which was located outside of Europe. We delivered the complete engineering and the manufacturing of the lifting carrier to the short bar separator. On top of this we purchased the standard components for the project, such as; electric, hardware, motors, hydraulic components, bearings and bushings.
Services in this project
| WeSolve AB | PROAC AB |
---|---|---|
Engineering | ||
Project Management | ||
Manufacturing | ||
Installation at site |
Project Gallery
Steel handling equipment