Project description
To engineer a new loading equipment to a steel plant.
This facility was in need of a completely new lifting wagon. This wagon needed to be able to lift a steel wire ring, with the weight of up to 3600 kg, up on a new chain conveyor. The chain conveyor is 32 m long and has the capacity to storage/transport 20 of these steel wire rings at the same time.
Services in this project
| WeSolve AB | PROAC AB |
---|---|---|
Engineering | ||
Project Management | ||
Manufacturing | ||
Installation at site |
Project Gallery
Loading equipment