Loading equipment

Project description

To engineer a new loading equipment to a steel plant.

This facility was in need of a completely new lifting wagon. This wagon needed to be able to lift a steel wire ring, with the weight of up to 3600 kg, up on a new chain conveyor. The chain conveyor is 32 m long and has the capacity to storage/transport 20 of these steel wire rings at the same time.

Services in this project


WeSolve AB

PROAC AB

Engineering

Project Management

Manufacturing

Installation at site

Project Gallery

        

Loading equipment

You May Also Like